Project Year 2011
7-YP Irrigation
7-YP Irrigation
Contract Price : 32.734.581 USD
Technical Details
Photogallery
Project Video

7-YP IRRIGATION

Owner of the Project : State Hydraulic Works (DSI)
Purpose : Irrigation and Drainage
Scope of the Project :

  • Construction of Pump Station (One for Drainage, One for Irrigation)
  • Manufacturing and Installation of Canalet (64.395 m)
  • Construction of Discharge Canal (11.755 m)
  • Construction of Filed Works

Contractor:Joint Venture
Eren Company Share : % 60
Irrigation Area : 11.373 ha
Irrigation Canal Length : 42.864 m (Stone and Concrete Walls)
Irrigation Canal Length : 347.730 m (Prefabricated Canal)
Drainage Canal Length : 245.341 m
Operation and Maintenance Roads Length: 43.000 m
Siphon Length: : 2.015 m
Irrigation Pump Number : 1
Drainage Pump Number : 1
Field Structure (Culverts, Bridges, etc.) Number :1.288
Excavation : 5.275.200 m³
Fill : 900.000 m³
Concrete : 67.990 m³

Contract Price : 44.203.835 YTL (32.734.581 USD)
Completion Date of the Work : 30/12/2010