ÇEKEREK (SÜREYYABEY) DAM & HEPP
Owner of the Project : State Hydraulic Works (DSI)
Purpose : Irrigation and Hydroelectric Energy Generation
Scope of the Project :
Contractor : Joint Venture
Eren Company Share : %25
Dam Height (From River Bed): 77.05 m
Dam Height (From Foundation): 102.50 m
Dam Type :Rock Fill With Clay Core
Dam Body Volume : : 7.181.704 m³
Excavation : 12.527.824 m3
Reservoir Volume : 1.310.000.000 m³
Fill : 7.181.704 m³
Concrete : 182.192 m³
Contract Price : : 194.251.509 USD
Completion Date of the Work : 18/05/2011