Mardin Ceylanpinar Plains Main Irrigation Canal Phase 3
Contract Price: 75.851.000 USD
Technical Details
Photogallery
Project Video
Mardin Ceylanpinar Plains Main Irrigation Canal Phase 3
Owner of the Project: State Hydraulic Works (DSİ)
Purpose: Irrigation
Scope of the Project: Construction of a 62.75 kms of an irrigation canal with a discharge capacity of 144 m³/s which includes various structures such as bridges, upper/lower flood passes and culverts along the way.
Discharge Capacity : 144 m³/s Length of Canal : 62.75 km